
Waterproofing solutions by NAVA INTERIOR
Water damage is one of the most expensive problems in UAE buildings: ceiling stains, peeling paint, mould, rusting steel and cracked concrete. NAVA INTERIOR provides complete waterproofing for villas, apartments and commercial buildings, from leak investigation to a fully tested, long-life system. We use certified membranes and coatings from leading manufacturers such as Sika, Fosroc, Henkel (Polybit) and Mapei, chosen for the surface, the exposure and the UAE climate of extreme heat, UV and humidity.
What's included
- Leak investigation with moisture meters
- Surface preparation and crack repair
- Primer and bonding coats
- Membranes and liquid coatings
- Reinforcement at joints and corners
- 24–48 hour flood testing
- Protective screed or top coat
- Written warranty on the system
Our waterproofing process
- Leak investigation: We trace the real source of the water with moisture meters and visual inspection, not guesswork.
- System selection: We recommend the right system for the surface and exposure and explain the options in writing.
- Surface preparation: Old coatings are removed, cracks are repaired and the surface is cleaned and primed for full bonding.
- Application: Membranes or coatings are applied to the specified thickness, with extra reinforcement at corners, drains and joints.
- Flood test: The area is flooded for 24–48 hours to prove it is watertight before any tiles or screed go on.
- Protection & handover: A protective layer is added and you receive photos, test results and the warranty.
Waterproofing systems we install
Bituminous torch-on membrane
Proven, heavy-duty sheet membrane for flat concrete roofs and foundations.
Polyurethane (PU) liquid membrane
Seamless, elastic and UV-resistant. Ideal for exposed roofs, balconies and complex shapes.
Cementitious coating
Strong, breathable coating for bathrooms, kitchens, basements and water tanks.
Acrylic elastomeric coating
Reflective white roof coating that also lowers roof temperature and AC load.
Epoxy & potable-safe coating
Food-grade lining approved for drinking-water tanks.
PU crack injection
Expanding resin injected into active leaks and cracks in concrete walls and slabs.
Pricing
Every home is different, so we quote after a free inspection, or from photos you send on WhatsApp (+971 56 752 2656). You receive a clear written quote before any work starts. Typical duration: 1–3 days.
Areas we cover
We provide waterproofing solutions across Dubai, Abu Dhabi, Sharjah, Ajman, including Dubai Marina, Downtown, JVC, Palm Jumeirah, Dubai Hills, Al Reem Island and Saadiyat Island.
Frequently asked questions
How do I know where the leak is coming from?
We investigate before quoting, using moisture meters and inspection of the roof, bathrooms and pipes above the damaged area.
How long does waterproofing last?
Depending on the system, 10–15 years for membranes and 5–10 years for exposed coatings when installed correctly.
Do you need to remove my tiles?
For bathrooms and balconies, usually yes, to waterproof properly underneath. For some leaks, injection works without removing tiles.
Can you waterproof in summer?
Yes. We schedule exposed roof work in the early morning and evening to protect the materials and the team.
Is your work guaranteed?
Yes. Every job comes with a 90-day workmanship warranty. If the same problem comes back, we fix it free.
How do I pay?
Pay after the job by card, Apple Pay, bank transfer or cash. Larger projects are paid in stages.
Which areas do you cover?
All of Dubai, Abu Dhabi, Sharjah and Ajman, with same-day slots in most areas.
Need waterproofing solutions?
Free inspection and written quote. In-house team. 90-day workmanship warranty.